What is capacity planning?

Capacity planning is calculating how much work machines, work centers and labor can do in production over a given period and distributing work orders according to those limits.

A workplace related to Capacity planning
In short

The aim is to see bottlenecks in advance so orders can be delivered on time. It prevents one machine from sitting idle while another piles up. The plan distributes work orders according to the capacity limit and makes the bottleneck visible before a delivery date is promised.

What you need to know about Capacity planning

Capacity planning: How is capacity planning done?

How is capacity planning done?

First, the available time of each work center is worked out: number of shifts, working days, allowance for maintenance and breaks. Then the load is calculated by adding up the operation times (setup and run time) in the routing of each work order. Load is compared with capacity. If load exceeds capacity, the job is scheduled earlier or later, a shift is added, the work is subcontracted or moved to an alternative machine. ERP can redo this calculation as orders change. Machine breakdowns, maintenance and shift patterns are also deducted from capacity during the calculation, so planned maintenance must be written into the capacity plan as well.

Capacity planning: Who uses it?

Who uses it?

The production planning lead owns the capacity plan. The sales team checks the plan to give a realistic delivery date for a new order. The production manager sees bottleneck machines and overtime needs here. The maintenance unit schedules planned maintenance so that it does not disrupt capacity. Purchasing plans suppliers for subcontracting needs from this output. The output of the plan is a sequence showing which work order will run on which machine and when, plus bottleneck warnings; delivery date promises should rest on this plan.

Capacity planning: What to watch out for

What to watch out for

The plan depends on the accuracy of operation times. If the time defined on paper differs from the real time on the shop floor, the plan will not hold. Feed actual times back regularly. Leave a buffer for machine breakdowns, material delays and urgent orders. A plan made with an infinite-capacity assumption does not show the bottleneck; where possible, work with finite capacity. Changing the plan too often reduces trust on the shop floor, so set a change rule. When the product mix changes, operation times change too; the plan should be updated by product type, not just by total quantity.

See how Capacity planning would work in your business

Tell us briefly about your process and we will walk through the screens with your own example.

  • Reply the same business day
  • 15+ years of experience
  • 90 client businesses

What does Panda AI do here?

Panda AI reads end-of-shift production records, compares planned and actual time and lists the deviations. Changing the plan is the planner's decision.

Frequently asked questions about Capacity planning

What is the difference between capacity planning and MRP?

MRP calculates material requirements. Capacity planning checks whether the work to be done with those materials fits within machine and labor capacity. The two are used together.

What is a bottleneck?

A bottleneck is the point on a production line with the lowest capacity, which limits total output. Improving that point first eases the overall flow.

See Capacity planning with your own data

Describe your process in a few sentences and we will show you the modules that fit.

  • 15+ years of enterprise software experience
  • In the cloud or on your own server
  • Processes compliant with KVKK (Turkey's data protection law)