Panda ERP

The measurement is on a paper form, the CAPA is in Excel, and no one knows which instruction version is valid

The Quality Management module keeps the control plan, measurement record, corrective and preventive action (CAPA), calibration, supplier evaluation and document version in one record. Deviations show at the moment of measurement, not at the audit.

Quality management
In short

Quality Management is the Panda ERP module that runs incoming, in-process and final control plans, measurement results, corrective and preventive action (CAPA) records, measuring instrument calibration, supplier quality evaluation and version management of quality documents. A measurement result is compared with the specification; a deviation is linked to the work order and the supplier card, and the quality manager decides on closure.

How is this work done today?

  • Control form on paper, result in a file

    The operator writes the measurement on a paper form and the quality technician types it into Excel in the evening; an out-of-tolerance value is noticed the next day.

    1 quality technician × 1 hour / day
  • CAPA tracked by email

    A nonconformity report is opened by email, the owner and deadline sit in a tracking list; CAPAs that were never closed are chased just before an audit.

    1 quality manager × 2 hours / week
  • Calibration dates on a wall calendar

    The calibration dates of calipers and scales are in a folder; that a measurement was made with an expired instrument only comes out at the audit.

    1 person × 3 hours / month

How does Quality management work?

  1. 1

    The control plan is defined

    For each product and operation, the characteristic to measure, tolerance, sample size and measuring instrument are written into the control plan. Existing plans are imported from Excel.

  2. 2

    The measurement is recorded

    At incoming inspection a control record opens from the waybill, in process from the work order; the operator or quality technician enters the value, and an out-of-tolerance value is flagged immediately.

  3. 3

    The deviation turns into a CAPA

    A nonconformity record is linked to a CAPA with an owner, root cause, action and deadline; it is followed through the work order or supplier card, and quality approves the closure.

  4. 4

    Analysis, calibration and documents

    Measurement data goes into statistical analysis, instruments nearing calibration are listed; the valid version of instructions and forms is distributed from one place.

See how Quality management would work in your business

Tell us briefly about your process and we will walk through the screens with your own example.

  • Reply the same business day
  • 15+ years of experience
  • 90 client businesses

Quality management features

Quality management: Control plan
  • Control plan

    Product-based characteristic, tolerance, sample and instrument definitions for incoming, in-process and final control; the plan is linked to the bill of materials.

  • Measurement record and alert

    The measured value is entered from the work order or waybill; an out-of-tolerance result is flagged immediately and the approval mechanism kicks in.

  • CAPA tracking

    Nonconformity, root cause, action, owner and deadline in one record; the open CAPA list and closure approval sit with the quality manager.

Quality management: Statistical process analysis
  • Statistical process analysis

    Measurement results turn into control charts and distribution reports; the deviation trend is visible by product and workstation.

  • Calibration and measuring instruments

    Each instrument's calibration date and certificate (PDF) are on its card; instruments nearing expiry are listed, and an expired instrument cannot be used for measurement.

  • Supplier quality evaluation

    Incoming inspection results, rejects and CAPA counts are scored on the supplier card; the score is visible in purchasing quote comparison.

  • Document and version management

    Numbered versions of instructions, forms and procedures; old versions in the archive, the valid version shown on the workstation screen.

  • Audit reports

    Reject rate, CAPA closure time, calibration status and supplier score by date range; output as Excel and PDF.

What does Panda AI add to Quality management?

The Production and Planning Agent is the Panda AI agent that answers, in a single question, an order’s delivery date, whether work orders have the materials they need and where there is a risk of delay.

  1. Today The plan is kept in Excel and the ERP is updated afterwards With the agent The delivery date of any order with one question
  2. Today A material shortage is discovered when the line stops With the agent Material availability check for work orders
  3. Today Three people are asked for one delivery date With the agent Orders at risk of delay are flagged in advance

Jobs it takes on

  • Work order and delivery date queries
  • Material availability check
  • Scrap and efficiency reports
  • Delay risk alerts
  • End-of-shift summaries
  • Compiling quality records

The agent prepares, a person approves. Anything that posts a record or sends something outside the company goes through your approval.

Explore Panda AI agents

Frequently asked questions about Quality management

How does it connect to the Production module?

The control plan kicks in at work order closing; a work order does not close until the measurement is entered. A reject record is linked to the work order, the scrap line and the CAPA; in the production report the quality result appears on the same row, so the planner does not open a separate file.

Is incoming inspection linked to purchasing?

Yes. At goods receipt, the purchase waybill asks for a sample according to the control plan; the result is scored on the supplier card. A rejected lot goes to the quarantine warehouse and a return waybill to the supplier is issued from the same record; the score shows on the purchasing quote screen.

How does the operator enter a measurement?

The work order is scanned with the tablet or barcode reader at the workstation, the characteristics in the control plan appear in order, and the value is entered. An out-of-tolerance value is marked red; the decision to continue goes to an authorized person, and the operator cannot proceed alone.

Does it make ISO 9001 audit preparation easier?

The records an auditor asks for are ready in the system: control plans, measurement records, the CAPA list, calibration certificates and document version history. Who entered each record and when is kept in the audit log; the export is a one-click PDF.

How are document versions managed?

A new version opens as a draft, becomes the valid version once approved, and the old version moves to the archive. Only the valid version shows on the workstation screen; who approved which version stays on record, and old versions are never deleted but cannot be used.

What if calibration is done at an external laboratory?

The certificate is attached to the instrument card as a PDF and the next calibration date is calculated automatically. The upcoming date goes into the maintenance plan; an instrument past its date cannot be selected on the measurement screen, and the quality manager gets a warning.

Are customer complaints tracked in this module?

Yes. A complaint record is linked to the product, lot and shipment; root cause analysis and CAPA open in the same flow. If the After-sales Services module is on, it is matched with the service record, and the closing information to the customer goes from there.

What does the agent do in quality?

Test and measurement outputs are written to the quality record and compared with the specification; a list of deviations and open CAPAs arrives each morning. The quality manager makes the decisions and closes records; the agent does not close a CAPA or decide on rejection. Scenario: production report.

See Quality management with your own data

Describe your process in a few sentences and we will show you the modules that fit.

  • 15+ years of enterprise software experience
  • In the cloud or on your own server
  • Processes compliant with KVKK (Turkey's data protection law)

Last reviewed: · Panda Yazılım product team