Industry solution

Furniture: no more dealer orders in WhatsApp, cutting lists in Excel and subcontractors by phone

A dealer writes 'anthracite, left corner, three weeks'; the planner works out the product code from memory, builds the cutting list in Excel and phones the finisher. The agent turns the variant into a code, calculates board and fabric needs from the bill of materials and matches the subcontracted batch to its waybill; the shop foreman approves. Orders, cutting, assembly and e-Invoice sit in the same record.

A view from the Furniture Manufacturing industry
A view from the Furniture Manufacturing industry
A view from the Furniture Manufacturing industry

Recurring work in Furniture Manufacturing businesses

  • The variant is in a message, the product code is in someone's head

    A dealer or showroom writes fabric, colour and size on WhatsApp. Sales opens the order by hand and looks the variant code up in a list; a wrong arm direction is only noticed once production is finished.

  • Cutting list in Excel, board count by hand

    Panel sizes for the day's work orders are dumped into Excel and the board requirement is worked out on a calculator. A missing board is discovered when cutting starts, and the machine waits.

  • Subcontracting and assembly are chased by phone

    Polishing and metal legs go to the subcontractor with a waybill, and the return is asked about by phone. The assembly crew's appointments sit in a calendar, the customer gets the time on WhatsApp; clashes show up at the customer's door.

Panda in Furniture Manufacturing

A view from the Furniture Manufacturing industry

Order, recipe, cutting and assembly in one record

Which board a dealer order was cut from, which subcontractor it is waiting at and when it will be assembled shows up in one query. Variant information travels from cutting to delivery.

  • Make-to-order production and variants
  • Product tree and bill of materials
  • Board cutting list
A view from the Furniture Manufacturing industry

Automatic material requirement from the bill of materials

The product tree calculates metres of fabric, square metres of foam and the number of boards when the order is placed. A missing component becomes a purchasing suggestion; a price change flows into cost.

  • Upholstery and assembly work orders
  • Subcontractor tracking
  • Delivery and assembly appointments

See how Furniture Manufacturing would work in your business

Tell us briefly about your process and we will walk through the screens with your own example.

  • Reply the same business day
  • 15+ years of experience
  • 90 client businesses

How is it done today, and how does it work with an agent?

Figures are process estimates (people × hours); in every scenario the final approval stays with your team.

  1. 01 Dealer order into the ERP with its variant

    Today

    The dealer's message is read, the product and variant code are looked up, the order is opened by hand; the dealer price list is checked in a separate file.

    With an AI agent

    The agent reads the message, matches the customer account and variant to the product code, opens the order at the dealer price and works out the material requirement from the bill of materials. An out-of-range or undefined variant goes to sales; a person gives the approval.

    12 min per order × 9 orders = 1.8 hours of manual entry per day
  2. 02 Board cutting list

    Today

    Every morning the planner dumps the panel sizes from the work orders into Excel, calculates the board requirement and has the list printed for the cutting operator.

    With an AI agent

    The agent converts the work orders into a cutting list by board size, suggests purchasing any missing boards and sends the list to the machine. A list that exceeds the waste threshold goes to the planner; the cutting operator approves.

    1 hour every morning × 22 days = 22 hours per month
  3. 03 Subcontracted batch and assembly appointment

    Today

    The subcontractor is phoned, returned parts are counted against the waybill; the assembly appointment is written in a calendar and the customer is told the time by individual messages.

    With an AI agent

    The agent matches subcontractor outgoing and incoming waybills by batch and reminds about late jobs; it writes an order that has passed final inspection into the crew's calendar and sends the customer an SMS. Door and floor confirmation goes to the dispatch lead; a person approves the appointment.

    45 min per day × 22 days = 16.5 hours per month

Panda ERP features for Furniture Manufacturing

  • Make-to-order production and variants

    Fabric, colour, size and arm-direction variants on the order line; the dealer price list and lead time on the same screen, and the work order opens with one click.

  • Product tree and bill of materials

    Multi-level component tree, quantity and cost; when the fabric price changes the unit cost is refreshed, and a missing component goes to purchasing.

  • Board cutting list

    Panel sizes from the work orders are listed by board size; board requirement, waste and sending to the machine on one screen, with a missing-board alert.

  • Upholstery and assembly work orders

    Frame, foam, upholstery, assembly and final inspection stages in a board view; stage closing on a tablet, a waiting queue for missing fabric.

  • Subcontractor tracking

    Outgoing waybills to polishing, metal leg and glass subcontractors, batch-level return matching, lead times and reminders; quantity differences go to warehouse approval.

  • Delivery and assembly appointments

    Assembly crew calendar, vehicle loading plan and SMS to the customer; floor, lift and door-size confirmation on the card, mobile delivery approval at the door.

What does Panda AI take on for Furniture Manufacturing?

For Furniture Manufacturing, Panda AI takes on these jobs: Delivery date and production status queries per order; Material availability check for work orders; End-of-shift summary of output, scrap and downtime.

  1. Today The plan is kept in Excel and the ERP is updated afterwards With the agent The delivery date of any order with one question
  2. Today A material shortage is discovered when the line stops With the agent Material availability check for work orders
  3. Today Three people are asked for one delivery date With the agent Orders at risk of delay are flagged in advance

Jobs it takes on

  • Delivery date and production status queries per order
  • Material availability check for work orders
  • End-of-shift summary of output, scrap and downtime
  • Draft requests to purchasing
  • Daily production briefing for management

Sample scenario: A sales rep forwards a customer’s delivery date question to the agent over WhatsApp. The agent checks the order’s work order, the material status and the line plan, then replies with the estimated delivery date and any risk. The rep gets back to the customer without having to ring production.

The agent prepares, a person approves. Anything that posts a record or sends something outside the company goes through your approval.

Explore Panda AI agents

Do you have a question in mind?

Ask our specialist. If it is not the right fit for you, we will say so.

  • Reply the same business day
  • 15+ years of experience
  • 90 client businesses

See Furniture Manufacturing with your own data

Describe your process in a few sentences and we will show you the modules that fit.

  • 15+ years of enterprise software experience
  • In the cloud or on your own server
  • Processes compliant with KVKK (Turkey's data protection law)