ERP and modules

What is a bill of materials (BOM)?

A bill of materials (BOM) is a hierarchical list of the raw materials, semi-finished goods and components needed to produce a finished product, with their quantities.

A workplace related to Bill of materials (BOM)
In short

Each level descends to a sub-component. Purchasing, cost calculation and the production plan all draw from this list; if the list is wrong, all three are wrong. If revision numbers are kept, old orders are produced with the old BOM and new ones with the current BOM.

What you need to know about Bill of materials (BOM)

Bill of materials (BOM): How is a BOM prepared?

How is a BOM prepared?

The finished product is at the top, with the semi-finished goods and raw materials that make it up beneath it. Each line carries the component code, unit, quantity and, where needed, the scrap rate. Think of a table: four legs, a top and a screw set; each leg is itself a semi-finished item that can be made of raw tube. In ERP the BOM is built linked to stock cards. If a revision number and validity date are kept, old orders are produced with the old BOM and new orders with the new one.

Bill of materials (BOM): What is it used for?

What is it used for?

A BOM is used in three places. MRP opens the BOM to find missing materials. Cost calculation adds up component prices to get the unit cost. The work order takes its material list and warehouse issue quantities from the BOM. It is also used at quotation stage: when a new product is requested, copying a similar BOM and adding the difference is fast. The scrap rate and alternative-material information in the BOM feed into these calculations too; a wrongly entered rate shifts the whole cost.

Bill of materials (BOM): What to watch out for

What to watch out for

The biggest enemies of a BOM are outdated lists and hidden changes on the shop floor. When engineering changes a component, the BOM in ERP should be updated the same day. Define alternative materials, scrap and subcontracted operations explicitly in the BOM. In multi-level BOMs, watch for loop errors (a component appearing under itself). The terms BOM and recipe are often used for the same thing; the name changes by sector. If every change to the BOM is also recorded with who approved it, finding the reason later becomes easier.

See how Bill of materials (BOM) would work in your business

Tell us briefly about your process and we will walk through the screens with your own example.

  • Reply the same business day
  • 15+ years of experience
  • 90 client businesses

Frequently asked questions about Bill of materials (BOM)

Is a BOM the same as a recipe?

Mostly yes. In food and chemicals it is called a 'recipe', in metalwork and assembly a 'bill of materials'. Both show which materials, in what quantities, make up a product.

How many levels can a BOM have?

The number of levels depends on the product. Simple products have one level, assembled products several. Each semi-finished item can have its own BOM.

See Bill of materials (BOM) with your own data

Describe your process in a few sentences and we will show you the modules that fit.

  • 15+ years of enterprise software experience
  • In the cloud or on your own server
  • Processes compliant with KVKK (Turkey's data protection law)